PC Strand, or prestressed concrete strand, is a high-strength steel cable made from twisted wires that reinforces concrete structures under tension. It's essential for modern infrastructure like bridges and flyovers, enabling longer spans and greater durability. This blog explores its role, benefits, installation, and real-world uses.
Bridges face heavy traffic, dynamic loads, and environmental stresses, making PC Strand ideal for prestressing girders and beams. It allows longer spans without intermediate supports, reducing construction costs and material use. In pre-tensioning, strands are stretched before concrete pouring; in post-tensioning, they're tensioned after hardening via ducts.
This prestress boosts load-bearing capacity by 50% or more compared to non-prestressed designs, minimizing cracks. Structures last longer, often exceeding 50 years with proper maintenance.
Flyovers, or elevated roadways, demand lightweight yet strong designs for urban traffic flow. PC Strand reinforces I-girders and slabs, handling spans up to 40 meters with double pillars. Bonded post-tensioning, like the 19DP13 system, embeds strands in grout-filled ducts for superior bonding.
In projects like Gujarat's Gota Junction 6-lane flyover, PC Strand enabled efficient load distribution under heavy vehicles. It reduces dead loads, speeds construction, and enhances seismic resilience—key for high-traffic areas.
Durability: Resists cracking, corrosion, and fatigue, extending lifespan in harsh conditions.
Efficiency: Thinner sections mean less concrete and steel, cutting costs by optimizing material use.
Safety: Higher capacity handles overloads; low relaxation ensures consistent performance.
Versatility: Suits cable-stayed, beam, and arch bridges; epoxy coatings boost longevity in stay cables.
These advantages lower maintenance and support sustainable builds with reduced resources.
Strands are placed in ducts or molds per design specs.
Concrete is cast; for post-tensioning, it cures first.
Hydraulic jacks tension strands to precise loads, then anchors secure them.
Grout fills ducts in bonded systems for corrosion protection.
Quality tests check tensile strength, elongation, and defects per AASHTO standards. Proper execution prevents voids that could lead to failures.
China's Sutong Bridge uses PC Strand in stay cables for its 1,088-meter span, with epoxy coatings minimizing maintenance. France's Pont de Normandie (856-meter span) relies on similar strands for mega cable-stayed efficiency.
In the US, large 0.7-inch strands in precast girders cut girder needs from 6 to 4 per panel, speeding builds. India's Gota flyover demonstrates bonded systems for cost-effective urban elevation.
Project | Type | PC Strand Role | Span/Notes |
Sutong Bridge | Cable-Stayed Bridge | Stay Cables | 1,088m main span; epoxy-coated |
Pont de Normandie | Cable-Stayed Bridge | Main Cables | 856m; high-tensile strands |
Gota Junction Flyover | Flyover | Post-Tensioned Girders | 6 lanes; 19DP13 system |
US Precast Bridges | Beam Bridges | Pretensioned Girders | Reduced girders by 33% |
Larger-diameter strands (e.g., 18mm) and high-performance concrete promise even lighter designs. Innovations like compression-fitting systems enhance dynamic loads in cable-stayed flyovers. With global infrastructure booms, demand grows for corrosion-resistant variants.
For reliable PC Strand supply meeting ASTM/AASHTO specs, contact TJ Wasungen Metal Products Co., Ltd. They offer epoxy-coated, galvanized, and plain strands for bridges and flyovers, backed by Tianjin facilities. Reach out via WhatsApp +86-13622011252 or sales@tjwasungen.com for tailored solutions.